Customer: Matt
Location: Northeast Arlington, WA 98223, Snohomish County
Service date: July 15-16, 2026
Service completed: July 16, 2026
Service: Emergency Septic Pump-Out and Diagnostic
System: Low-pressure distribution (LPD) system, installed in 2004, with a 1,000-gallon concrete septic tank, a 1,000-gallon concrete pump chamber, a Hydromatic SP40 effluent pump, and 267 linear feet of drainfield across four pressurized trenches
Crew: Dennis (10 years of experience), Peter (4 years of experience)
Total: $1,500 plus tax for the emergency response and diagnostic. Structural repair estimate presented on-site, currently on hold at the customer's request.