System: New 1,000-gallon two-compartment concrete septic tank, Orenco high-head effluent pump in a dedicated vault, and a Low Pressure Distribution drainfield in the front lawn reserve bed, replacing a gravity system over 20 years old with three lateral lines feeding infiltrator domes
Crew: Denis, Alex, Pavel, Slavic, Garett, and Fernando, with a licensed septic designer supporting the system design and permitting process
Total: $21,031 gross before adjustments, $19,831 final for design, permitting, and installation, excluding diagnostic and interim pumping service calls.
"Recently had our 20-plus-year-old septic pumped and inspected by another company. They found water standing in the hole containing the distributor box. Further inspection indicated blocked distributor pipes (3) about 1/4 down the drain field. They scoped the pipes and attempted to power flush them but only got about 1/2 down the length of the drain field. They said the system beyond that point has failed. They said not an emergency but strongly recommended immediate planning for a new drain field. We want to get a second opinion," Greg wrote when he first contacted Septic Solutions in February 2026.
His system was a conventional gravity setup, over 20 years old, running three lateral lines out to infiltrator domes. A previous contractor had already scoped and power-flushed the lines, gotten about halfway down the field, and walked away, calling the rest of it failed. Greg wanted a second set of eyes before committing to a full drainfield replacement, so our technician Toon went out to scope the system independently.